卷?yè)P(yáng)啟閉機(jī)用來(lái)啟閉較重的閘門(mén)
The winch hoist is used to open and close heavier gates
卷?yè)P(yáng)啟閉機(jī)機(jī)適用于各種較重噸位的閘門(mén)以及液壓工程閘門(mén)的啟閉。它可用于平原或山區(qū)有無(wú)電源。產(chǎn)品主要由電機(jī)、聯(lián)軸器、傳動(dòng)軸、減速器、交流制動(dòng)器、開(kāi)式齒輪、鼓形件、皮帶輪系列件、電控箱、負(fù)載控制器、手搖臂、齒條組等組成。對(duì)。結(jié)構(gòu)緊湊,承載能力大,運(yùn)行穩(wěn)定可靠,安裝維護(hù)方便,設(shè)計(jì)合理。隨著距離的增型槽模具 一次性止血帶 保定水處理設(shè)備 一次性止血帶 保定空壓機(jī) 北京真空泵加,產(chǎn)品可配備三體式或傳動(dòng)軸軸承。
The
winch hoist is suitable for the opening and closing of various heavy
tonnage gates and hydraulic engineering gates. It can be used for plains
or mountainous areas with or without power supply. The product mainly
consists of motors, couplings, transmission shafts, reducers, AC brakes,
open gears, drum parts, pulley series parts, electric control boxes,
load controllers, hand rocker arms, gear racks, etc. yes. Compact
structure, large load-bearing capacity, stable and reliable operation,
convenient installation and maintenance, and reasonable design. As the
distance increases, the product can be equipped with three body or
transmission shaft bearings.
卷?yè)P(yáng)啟閉機(jī)在安裝與調(diào)試時(shí)需要注意:
When installing and debugging the winch hoist, attention should be paid to:
1、安裝起重葫蘆時(shí),底座的基礎(chǔ)應(yīng)牢固、平整,留出腳螺釘?shù)奈恢谩I禉C(jī)到位后,地基應(yīng)平整并澆灌。
1.
When installing the lifting hoist, the foundation of the base should be
firm and flat, leaving a space for the foot screws. After the elevator
is in place, the foundation should be leveled and poured.
2、首先,鋼絲繩纏繞在平衡輪上。鋼絲繩的長(zhǎng)度在兩邊都是等分的。鋼絲繩由活動(dòng)滑輪組纏繞,鋼絲繩的端部固定在滾筒的端部。
2.
Firstly, the steel wire rope is wrapped around the balancing wheel. The
length of the steel wire rope is equally divided on both sides. The
steel wire rope is wound by a movable pulley block, and the end of the
steel wire rope is fixed at the end of the drum.
3、在空載情況下,確保三相電流不平衡不超過(guò)正負(fù)10%,并測(cè)量電流值。
3.
Under no-load conditions, ensure that the three-phase current imbalance
does not exceed plus or minus 10%, and measure the current value.
4、上下限位調(diào)整:當(dāng)閘門(mén)完全關(guān)閉時(shí),按下行程開(kāi)關(guān)的上限并將其固定在螺絲上。當(dāng)閘門(mén)完全打開(kāi)時(shí),下限板壓下沖程開(kāi)關(guān)并固定在螺桿上。
4.
Upper and lower limit adjustment: When the gate is fully closed, press
the upper limit of the travel switch and fix it on the screw. When the
gate is fully open, the lower limit plate presses down on the stroke
switch and fixes it on the screw.