什么是機閘一體閘門?機閘一體閘門系列產品是污水處理工程,水利水電工程,給排水工程中常用的擋水止水設備。它們由門框,門板,止水橡膠和可調式沖壓機組成。不銹鋼閘門使用磨損后,可通過齒壓機調節密封面,確保正常運行。高質量的鋼板用作澆口部分的基礎材料。采用橡膠防水防腐作為噴砂,除銹,熱噴鋅的表面。該閘門具有耐磨耐腐蝕,性能可靠,結構合理,安裝調試使用方便的特點。閘門和啟閉機巧妙的結合在一起,組成了機閘一體閘門。適合渠道安裝。無需安家莊電動伸縮門 保定桌椅 保定水處理設備 河北機械加工 保定養老院 保定防水裝升降平臺,易于安裝。主要適用于正壓下停水。可以根據用戶的需要制造反向止水門。
What
is the integrated gate of the machine gate? The machine gate integrated
gate series products are commonly used water blocking and sealing
equipment in sewage treatment engineering, water conservancy and
hydropower engineering, and water supply and drainage engineering. They
are composed of door frames, door panels, waterstop rubber, and
adjustable stamping machines. After the stainless steel gate is worn
out, the sealing surface can be adjusted by a gear press to ensure
normal operation. High quality steel plates are used as the foundation
material for the gate section. Using rubber waterproof and
anti-corrosion as the surface for sandblasting, rust removal, and hot
zinc spraying. The gate has the characteristics of wear and corrosion
resistance, reliable performance, reasonable structure, and convenient
installation, debugging, and use. The ingenious combination of the gate
and the hoist forms an integrated gate with a mechanical gate. Suitable
for channel installation. No need to install a lifting platform, easy to
install. Mainly suitable for stopping water under positive pressure.
Reverse water stop doors can be manufactured according to user needs.
機閘一體閘門的整體閘門通常可以承受1-6米的水頭,也可泥桿 保定古箏 塑料增韌劑 拱形護坡模具 保定空調維修 托輥生產線以承受一定的反水頭。它可以制造高水頭水閥從而滿足特定用戶的要求。只有當澆口板和澆口框架之間的密封間隙通過整體安裝和第二階段澆注調節到0.3mm以下時,才能進行第二階段澆注。澆筑混凝土時,必須清除流入閘門,閘門框架,斜鐵板和擋板間隙的泥漿,以防止漿料在凝固后影響閘門的開閉。閘門的上下框架中設有固定塊,可以防止閘門在吊裝和運輸的時候閘門的滑出。閘門安裝完成后,在使用前應該拆除上下框架的滑塊。拆除完成后將螺栓擰緊。當打開和關閉整體的閘門時,應注意閘門的上下位置,以防止損壞閘門或者啟閉機。
The
integrated gate of the machine gate can usually withstand a water head
of 1-6 meters and can also withstand a certain amount of backflow head.
It can manufacture high head water valves to meet the requirements of
specific users. The second stage pouring can only be carried out when
the sealing gap between the gate plate and the gate frame is adjusted to
below 0.3mm through overall installation and second stage pouring. When
pouring concrete, it is necessary to remove the slurry that flows into
the gaps between the gate, gate frame, inclined iron plate, and baffle
to prevent the slurry from affecting the opening and closing of the gate
after solidification. There are fixed blocks in the upper and lower
frames of the gate, which can prevent the gate from sliding out during
lifting and transportation. After the installation of the gate, the
sliding blocks of the upper and lower frames should be removed before
use. After removal, tighten the bolts. When opening and closing the
overall gate, attention should be paid to the upper and lower positions
of the gate to prevent damage to the gate or hoist.